Payment on
account
  • My Bookmarklist My Bookmarklist
    0
  • Basket Basket
    0 0,00
(0)

Böker Baumwerk Magnum Long Lead EDC

Stainless steel gentleman's or gourmet pocket knife
Böker Baumwerk Magnum Long Lead EDC Böker Baumwerk Magnum Long Lead EDC Magnum Long Lead EDC ()
new
percent
  • Magnum Long Lead EDC
  • Zusammengeklappt / Folded

Description

With the Magnum Long Lead EDC by Böker noble design meets proven function. The gentleman's pocket knife convinces with easy handling, a stainless blade made of satin-finished 440B steel and lies well in the hand with the textured handle. Thanks to the practical attachment clip you can take the pocket knife handy with you on your adventure.

Material / Details

  • Blade material: American 440B steel
  • Blade length: 8.00 cm
  • Blade thickness: 2.70 mm
  • Satin-finished flat-ground blade
  • Grip material: G10, glass fiber reinforced resin
  • Slipjoint closure
  • No locking
  • Nagelhau opening aid
  • Opening: manual
  • Two-hand operation
  • contoured handle design
  • Mounting clip
  • Total length: 18.4 cm
  • Weight: 78 g

Details of the manufacturer

  • Manufacturer: Heinr. Böker Baumwerk GmbH Solingen
  • Address: Schützenstr. 30, 42659 Solingen, Germany
  • Contact Email: info@boker.de
show manufacturer information

Store availability

This item is not currently available in any store.

  • Bremen
  • Münster
  • Oldenburg
  • Wilhelmshaven
  • Jever
  • Kiel
  • Erfurt
  • Bonn
  • Leipzig
  • Düsseldorf

Click & Collect

Buy online & have it delivered to the branch of your choice.

  1. Add goods to the shopping cart
  2. Go to checkout
  3. Shipping option "deliver to store"
  4. For payment method "at pickup" or the desired online payment method
  5. You will be notified by the store as soon as the goods are ready for you

For the time being, this service is available in Bonn, Bremen, Duisburg, Düsseldorf, Erfurt, Essen, Flensburg, Göttingen, Hamm, Jever, Kiel, Leipzig, Münster, Oldenburg and Wilhelmshaven.

Environmental Seal


Learn more

0 reviews

0 out of 5 points based on 0 reviews in total

Notes on our product reviews

To ensure the authenticity of product reviews on Unterwegs, we apply the following measures:
- Only customers who have purchased the product will receive a link to the product review. The purchase must have been made at least 14 days ago.
- In addition, all product reviews are personally checked by us before approval.

Customer ratings

  • 5 Stars
    0
  • 4 Stars
    0
  • 3 Stars
    0
  • 2 Stars
    0
  • 1 Star
    0
Unterwegs der Outdoor-Shop